← concepts
TOA Architectswhat a TOA × assembl operating system could look like
The practice, drafted overnight.
It drafts, never decides. It flags, never claims.
The weekend queue · nothing sent
- 16A consent-stage client update — renders + massing5m
- 16A pre-consent check — 3 gaps flagged, each cited8m
- 16C + 16D fee proposal10m
- Kohia geotech PS1 chase — slope stability2m
- Karaka Bay — week 8 client update5m
- Matai Street — week 22 client update4m
- Waimā bracing calcs — B1/AS16m
- Southern acoustics RFI2m
10 drafts · ~46 review minutes · ~4 writing-hours saved
Ask ARC
Tap to draft. ARC reads the plan, the code and your project — and shows its working.
The project behind it
16A Hubert Henderson Place
Remuera, AucklandAUP Zone H465 m² two-bed380 mm slope225 mm stormwater line
- AUP Zone H4 · Mixed Housing Suburban
- 16A + 16B retained · 16C + 16D proposed (two-bed, 65 m²)
- Sloped site — 380 mm level difference
- 225 mm stormwater line crosses the site